January hasn't been as good weather wise so far, it's been very hot with temperatures in the 18-20 degree range at night, our SBIG CCD can't cool down to -20 in these conditions, also means that the mosquito population has exploded so we either sweat it out inside the observatory or get eaten alive outside, work on the repairs to the dome have commenced with Peter constructing some scaffolding on the outside of the observatory, we also had an issue with the shutter when the elastic guide rope snapped one night when Jonathan Green was opening up giving him a fright.
<- The Dome scaffolding in place ready for the repair work.
Now that the microlensing observing campaign has finished, Jonathan Green, Steve Hennerley and Andrew Buckingham headed out in the daytime to take off the "Nustrini" C14 Schmidt-Cassegrain telescope and replaced it with a Astronz GSO 12' Ritchey–Chrétien telescope, we are going to have to find an adapter for the Optec Temperature Compensating Focuser and we will have to spend a few clear nights working to get everything setup and operational again, if the tests from the new optical tube are positive we may ask the council to purchase either a 14' or a 16' Ritchey–Chrétien telescope for the observatory as the "Nustrini" is really getting quite old now and is due for retirement.
We also repaired the elastic guide rope for the shutter and replaced the last two old filters in the filter wheel of the SBIG CCD camera so we now have an all new LRGB set as well as a new Wratten 12 filter, with the councils consent Jonathan Green and Steve Hennerley also removed the bunk beds downstairs to make more room for an observation workstation, we are very happy to have done this as on removal we found Rat feces and urine marks in both beds and really those beds were a health hazard, there is also evidence that Rats have been getting into the roof of the observatory but with a pig farm on one side and a macadamia nut farm on the other we are probably always going to have a rodent problem, all we can do is set rat baits and hope to control the problem as best we can.
<- The downstairs room with bunk beds removed, plenty of space now for an observation workstation to be installed
So we still have plenty to do out at Kumeu, Andrew Buckingham also has a QHY ColdCMOS camera for us to try out although it's yet to arrive in New Zealand, we will need to work on the RC's collimation, do another pointing model, take flats, work out our pixel scale, field of view etc etc so plenty to keep us busy over the coming months, bring on the clear skies!
Posted by Jonathan Green